TIMELINE & SUPPORT


How long does it take to install the solar energy system?  What is the duration of the project life cycle? 

The typical installation time for a rooftop residential system is from 1.5 to 3 days. Ground-mounted systems or systems with batteries are more complex and may require additional time. Most of the installation occurs on the exterior of your house or business, so disturbance is minimized. The installation of commercial systems may require several weeks to >1 month, depending upon system size and type.


The duration of entire process from site survey to contract execution, installation, inspection, and activation, is approximately 30 to 45 days.  You begin saving on Day 1 of activation!


Will Renergy Solar help me apply for the Federal Tax Credit and other available rebates?


Yes, we will assist with the completion of all documentation regarding the Federal Tax Credit and available rebates.


Is a building permit needed for the project?

Yes, a building permit is required before installation. Renergy Solar will obtain the necessary permits from your local municipality.


Will the solar energy system require a building inspection after installation?


Yes, Renergy Solar will schedule and host all building inspections as required by your local municipality.

Do I need permission from the local utility to connect my system to the grid?


The local utility company has rules and procedures that must be followed to connect any power-generating system to the grid safely and legally. Renergy Solar will manage all of the necessary documentation and procedures.


Do I need approval from my homeowners' association?


If you belong to a homeowners’ association, you should revisit your covenants for details.